Поз.
Артикул
Описание
20
PANELLING
20
HEADLINER , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.06.2006
21
CLOSURE. FASTENER
22
COVER , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.06.06
22
PANELLING WIDTH, 658MM
30
PANELLING WIDTH, 668MM, TO BE ADAPTED DURING ASSEMBLY
182
INSULATION
318
PANELLING WIDTH, 668MM, TO BE ADAPTED DURING ASSEMBLY
319
PANELLING WIDTH, 668MM, TO BE ADAPTED DURING ASSEMBLY
341
RAIL666MM
342
PANELLING WIDTH, 668MM, TO BE ADAPTED DURING ASSEMBLY
342
PANELLING
344
LEDGE
362
RUBBER SECTION , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
362
EDGE TRIM , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
715
PANELLING